What is included in the project?

  • Rebuilding the front steps and ramps
  • Installing a snow melt system on the steps and ramps
  • Improving the water runoff (no more puddles!)
  • Replacing the handrailings and including lighting to improve safety
  • Repairing the stone wall
  • Replacing the emergency exit door on the Clinton Street side of the library and eliminating the alcove for additional security
  • Adding automatic door openers to the Clinton Street doors

How does this project affect the inside of the library?

  • The main entrance is closed, and the Clinton Street Doors will temporarily become the only available entry and exit
  • The curbside desk will have more staff available to assist with checkouts and holds
  • The doors leading into the library from the back hallway will be open during regular hours

When will the project be completed?

We anticipate the project will be complete by the end of July 2025 (without factoring in any weather-related delays)

What about parking?

Parking will not change, although some may prefer to park closer to the Clinton Street Doors. Clinton, Chestnut, and Center Streets will be open, as will Grand River Avenue and downtown parking lots.

How do I get into the building?

The Clinton Street Doors in the back of the building near the book returns and curbside pickup will be the only way to enter or exit the library.

How will I pick up my holds?

Your holds will still be waiting for you in the same locations. You may wish to select “curbside pick up” or “24/7 lockers” for easier access. Manage your holds.

Map showing main entrance closed and temporary new entrance at Clinton Street doors.